產(chǎn)品簡(jiǎn)介
Altena Doggersbank 61′離岸
Altena Yachting的一位客戶(hù)想要一艘海上游艇。一艘新船,,但在一個(gè)成熟的概念之后,。這就是Doggersbank設(shè)計(jì)出現(xiàn)的原因。
根據(jù)斯內(nèi)克的Vripack游艇設(shè)計(jì)公司的設(shè)計(jì),,他們已經(jīng)建造了數(shù)百艘,。Vripack的聯(lián)合董事Bart Bouwhuis。"一個(gè)堅(jiān)實(shí),、堅(jiān)硬和優(yōu)化開(kāi)發(fā)的設(shè)計(jì),,在任何情況下都能發(fā)揮其作用。Doggersbank號(hào)被稱(chēng)為可靠的游艇,,在荷蘭設(shè)計(jì)和建造,。你所看到的就是你所得到的"。
Altena游艇公司,。我們今年春天開(kāi)始建造Altena Doggersbank 66′ Offshore,采用鋼制圓舭船體和鋁制上層建筑,。
第一張圖片顯示了一艘非常堅(jiān)固的船,,具有經(jīng)典的線(xiàn)條。下降的船頭有下降的護(hù)舷和高高的防波堤,,駕駛室周?chē)衅咸蜒朗降臉?,后面是寬敞的沙龍。上面是飛橋和甲板,。除了雷達(dá)支架外,,還將有一個(gè)用于小艇的裝載吊車(chē)。
甲板下有三個(gè)船艙,,有六個(gè)固定床位,,還有兩個(gè)獨(dú)立的淋浴和廁所區(qū),。機(jī)房?jī)?nèi)安裝了兩臺(tái)約翰迪爾6缸柴油機(jī),每臺(tái)功率為235馬力,。為了提高船上的舒適度,,Doggersbank號(hào)將接受Naiad公司的穩(wěn)定系統(tǒng)。此外,,該船將配備兩根6米長(zhǎng)的Leeuwenstein水鉆桿,,與深水錨設(shè)備分開(kāi)。計(jì)劃在2021年底/2022年初交付,。
英文介紹
ALTENA DOGGERSBANK 61′ OFFSHORE
A customer of Altena Yachting wanted a seagoing yacht. A new ship, but after a proven concept. This is how the Doggersbank design came in sight.
According the design of Vripack Yacht Design in Sneek, hundreds of them have been built. Co-director Bart Bouwhuis of Vripack: “A solid, rigid and optimally developed design, ready to perform under all circumstances. The Doggersbank is known as a reliable yacht, designed and built in the Netherlands. What you see is what you get.”
Altena Yachting: We started the construction of the Altena Doggersbank 66′ Offshore this spring, with a steel round bilge hull and an aluminum superstructure.
The first images show a very sturdy ship with classic lines. A falling bow with falling fenders and high bulwarks, a Portuguese bridge around the wheelhouse and a spacious saloon behind it. On top are a flybridge and deck. In addition to the radar bracket, there will also be a loading crane for the dinghy.
Below decks there are three cabins with six fixed berths, and two separate shower and toilet areas. Two John Deere 6-cylinder diesels of 235 hp each are installed in the engine room. To increase comfort on board, the Doggersbank will receive a stabilization system from Naiad. Furthermore, the ship will be equipped with two 6-meter-long Leeuwenstein spud poles, separate from the deep-water anchor equipment. Delivery is scheduled for the end of 2021 / early 2022.
|